So I'm thinking I'm going to do some plumbing work. I think I can put this check valve in place up front at the T fitting that acts as the check valve for the driver side nozzle and then just plumb directly into each nozzle from it. I'll put a check valve at the pump and then this one up front which should act the same way the current system does but with easier access to the valves.