Quote:
Originally Posted by DerkPerk
You’ve got DWV (drain, waste, vent) fittings there. You need to use schedule 80 PVC pipe and fittings, the gray stuff.
|
Manufacturer specifically recommends schedule 40. The factory installed fittings coming out of the heater are schedule 40.