Quote:
Originally Posted by Nate2046
Tried to get a closer shot. I’m guessing the copper along the edge is the drip edge. Caulking sounds like a reasonable solution, so long as there isn’t any reason to leave it open. I’ve installed an asphalt shingle roof myself but not tile. Need to study up on the process.

|
Yep, that doesn't look right to me, Needs a cap not a drip edge. A cap would go over the shingle and down the fascia. I am thinking this probably should have had a return. Is there a section anywhere on the building that would have had the roof just end with out a return?