Quote:
Originally Posted by LEAKYSEALS951
The structural engineer will need to sign off on this before the building inspector will approve anything.
If you are really thinking about cutting out the bottom sides and doing doggy doors to cover it, make sure the open doors themselves clear 54 inches at the bottom, or you will need to slot those as well.
|
What's a building inspector??
I built my 12X20 deck...added on to it twice....building inspector never came out.
__________________
78 SC Targa Black....gone
84 Carrera Targa White
98 Honda Prelude
22 Honda Civic SI
25 John Deere X-590
Last edited by stevej37; 05-27-2021 at 12:23 PM..
|