|
Registered
Join Date: Apr 2002
Location: Houston (Clearlake), TX
Posts: 11,316
|
I doubt the navy tests did any building damage but I do wonder about the construction next door. Did they bore the pilings or drive the pilings? From the stories going around about complaints during construction it sounds like the drove the pilings. Good thing the HOA didn't accept their $400k offer which would likely have signed off any damaged caused by the construction.
Lots of people going to be sued over this. I imagine the City of Surfside is going to take a heavy hit since it sounds like they were slow walking the permits and down played the severity of the engineering report to the HOA.
I expect there will be major inspections of the sister building since they are similar if not identical designs built at the same time by the same construction company. They will be able to remove whole columns from the sister building if needed to determine if there are construction flaws.
__________________
2014 Cayman S (track rat w/GT4 suspension)
1979 930 (475 rwhp at 0.95 bar)
Last edited by David; 07-06-2021 at 05:47 AM..
|