Quote:
Originally Posted by cabmando
What do you mean? I watched an entire episode of flip or flop where they completely remodeled a home in one episode then sold it for huge profit! Why can't every contractor get something done in 1 hour?
|
Often takes me longer to get a permit released than they do an entire remodel. I haven't seen an inspection/local official on one of those shows yet.
We are currently 12 weeks for kitchen cabinets, used to be a week, and 3 weeks for countertops from template, used to be days.