View Single Post
Zeke Zeke is online now
Registered
 
Zeke's Avatar
 
Join Date: Jan 2002
Location: Long Beach CA, the sewer by the sea.
Posts: 38,334
Zero to 1 /14" in that short of span (but a long span for mud) generally gets done with wedge cut sleepers and a new sheet of subfloor. Fast, cheap and strong.

Old 12-03-2021, 08:01 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #18 (permalink)