View Single Post
gregpark gregpark is online now
Registered
 
Join Date: Dec 2016
Location: Napa
Posts: 2,378
Quote:
Originally Posted by Jolly Amaranto View Post
There are at least three people who should have caught this before it happened. The dispatcher should know the route and the clearances before they scheduled a train onto a particular line. The train conductor should also know the route clearances and the height of loads in his train. The engineer just operates the locomotives and drives the train. He has to be checked out on the route and know all the speed restrictions, length of his train and other things and have some idea about the loads in the consist.

No biggie, in today's car market these will be sold as convertibles
Old 01-20-2022, 10:53 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #7926 (permalink)