https://www.ercot.com/news/release/2022-12-16-ercot-closely-monitoring
Quote:
Dec 16, 2022
ERCOT Closely Monitoring Changing Weather Conditions
(Austin, TX) – As a series of cold fronts approach Texas, ERCOT continues to closely monitor weather forecasts and models. ERCOT expects sufficient generation to meet forecasted demand and will continue to provide updates.
Earlier today, ERCOT issued an Operating Condition Notice (OCN), a procedural notification to transmission and distribution owners and generation resources that temperatures will meet ERCOT’s criteria of 25 degrees or lower in the Austin/San Antonio and the Dallas Fort-Worth areas between Thursday, December 22 through Monday, December 26.
Over the past 18 months, ERCOT has worked closely with the Public Utility Commission and elected officials to implement reforms and increase grid reliability, including weatherization, bringing more generation online sooner if needed, and purchasing more reserve power. As a result, the reliability and resiliency of the grid has been strengthened significantly.
“Providing Texans with a reliable electric grid is our highest priority. As we monitor weather conditions, we want to assure Texans that the grid is resilient and reliable,” said Pablo Vegas, ERCOT President and CEO. “We will keep the public informed as weather conditions change throughout the coming week.”
Improvements Implemented that Make the Grid More Reliable
Weatherization and Inspections. Electric generation units and transmission facilities weatherize and are inspected by ERCOT.
Firm Fuel Supply Service. An additional source of fuel onsite for generators benefits the grid by providing a redundant, or additional, fuel source should there be a natural gas scarcity.
Scheduled Maintenance Period. ERCOT has worked with generators and transmission operators to schedule their maintenance so they could prepare their equipment for winter.
Fast Frequency Response Service. This is a new addition to our ancillary services that provides a group of generators that can power up quickly during operating conditions that change rapidly.
Reliability Unit Commitments. ERCOT can bring more generation online sooner when needed.
Critical Supply Chain and Critical Infrastructure Map. This map was created to share the locations and connectivity of all the critical parts of the Texas power infrastructure.
Improved Communications. Agencies are seeing improved communications through both the Texas Department of Emergency Management and Texas Energy Reliability Council.
|