|
The only thing I did not see was to drill and insert rebar into existing concrete with epoxy to secure it. Then the thickness of the actual concrete - needs to be at least 4" of concrete with rebar rises on blocks to be in the middle of the pour. Color to match, 3,500 PSI concrete?
__________________
'71 914-6 #0372
'17 Macan GTS
|