|
Monkey+Football
Join Date: Apr 2003
Location: It aint a popularity contest
Posts: 4,798
|
I did this a few mos ago. Your setup looks almost identical to mine less the dry set wall.
I cut them ~3 inches from flush to the concrete surface, put an auger bit in the drill and drilled out series of holes down the centerline running north --> south and east-->west, cleaned a little with a chisel for a (mostly) clean slot, took a 5 lb sledge and knocked the 4 sections inward one at a time, pulled them out mostly intact.
Once the first piece comes out the rest are easy. Trick is to get all the way down to the bottom of the post.
__________________
<Insert witty comment>
85 Targa Wong Chip Fabspeed M&K Bilsteins and a bunch of other stuff.
|