Quote:
Originally Posted by joe912/62
How do I test the green wires going to the distributor? Can I just pull on the connection and check for continuity at the 2 pins ? Do I need to remove the distributor to pull the plug off ? Also in the Bentley manual it states to test the CID connection between terminal 7 and 31d check while engine cranking and test for voltage (VAC) , what is VAC? I tested for power at #15 terminal and have power there.
Thanks
|
The green wire at the CDI should measure about 600 ohms and about .60 ACV while cranking.