|
Registered
Join Date: Jul 2001
Location: Lawrenceville GA 30045
Posts: 7,461
|
I was GC on my detached workshop build, and as the homeowner, was able to do electrical myself.
I got permits, requested inspections, subbed out foundation, truss installation and roofing. Did all other work myself (framing, electrical, exterior siding and trim, and finally painting.)
I did work with Ga Power to get a separate meter and 200A service off a local pole. No plumbing/water involved though.
Dealing with inspections (well - the main inspector) was a pain.
__________________
Mark
'83 SC Targa - since 5/5/2001
'06 911 S Aerokit - from 5/2/2016 to 11/14/2018
'11 911 S w/PDK - from 7/2/2021 to ???
|