Quote:
Originally Posted by nickelplated5s
Direct Lift or Max Jack it will be. Now I have to figure out sourcing high PSI concrete, don't think premix bags are the way to go. I don't really want to have a pump truck out for just a few yards. Pretty sure the pad is 4" but I haven't drilled test holes yet. Time consuming job but worth it in the end. Thank you all.
|
make sure you have 4" I told the guy that did my floor I was installing a lft and need 4" but only had 3.5". you can see in the picture I had to cut the floor 4' by 4' and dig down 12" for my lift.