|
We had ours redone. Similar size - slightly bigger pad. We too are on a hill.
Part of it was regrading the entrance from the road.
Used to pour down the driveway off the road when the under-road pipe clogged.
Now there’s a slight slope back to the road for 20’, the driveway is elevated 18-24” above where it used to be and life is better. A good backhoe operator can work miracles…
|