Quote:
Originally Posted by rsrguy
Got a jump on installing an AOA/heated pitot on the pacer wings, also prepped epoxy primed and first coated with polar gray. Photos show prep, epoxy and color coats.
|
Absolutely beautiful work. If I didn’t live so bloody far away, I would offer my services as “shop gofer” with hopes of gleening some of your trade secrets and pointers.
What three days of work gets me. Blocks 20-60# each. Had so walk them 40' and load into the truck, move truck and off load block. Trench for gravel base in a hard rock infested bits of earth. Stack block, pin with fiberglass rods. And for desert, move several tons of 3/4" crushed rock to back fill wall. One shovel full a a time. I stopped counting round trips after if felt like a thousand….[emoji849]
Only had 17 block left out of two pallets of left over block from the original wall project.
What three days of work gets me. Blocks 30-60# each. Had so walk them 40' and load into the truck, move truck and off load block. Trench for gravel base in a hard rock infested bit of earth. Stack block, pin with fiberglass rods. And for desert, move several tons of 3/4" crushed rock for pike to back fill wall. One shovel full a a time.

All in hopes of getting me into the mindset of the large block project of decorative garden walls[emoji6] all 13 pallets worth.
Sent from my iPhone using Tapatalk