Hey everyone ......... generator guys showed up a little before 8 this morning . I introduced myself to the crew of four ( owner + 3 ) . Then they started hauling out of their trailer the 500 lb + generator . That went as planned but then I noticed one of the guys and the owner talking and pointing to our house power meter . Uh oh

. So I asked if there was a problem and the answer was yes

. The owner when he came out to give the quote either didn't look or assumed or ??? but I don't have a cutoff switch on our house power meter .
So because of that the final electric hookup could not be completed today . Bummer but crap happens . The owner was very apologetic and owned up that he screwed up . Fair enough it is what it is . So the generator is installed and propane lines connected . All power lines coming out of the generator are in conduit and trenched just waiting to terminate at the transfer switch . We fired up the generator it sounds great/strong . So either later this week or next week the install will be completed . Here she is at her resting place