|
Registered
Join Date: Oct 2003
Location: Mount Pleasant, South Carolina
Posts: 14,805
|
Two weeks is enough. Besides, you’ll be doing a community service picking up the “trash”.
When I build my first house, I needed a wheelbarrow or two of gravel for a drain behind the retaining wall. Every day for a week, I would pass by a pile on the side of the road. I finally pulled over one day and loaded up what I needed.
The gravel stayed there for a month, so obviously nobody was looking for it
Last edited by A930Rocket; 09-08-2023 at 01:41 PM..
|