View Single Post
azbanks azbanks is offline
Registered
 
Join Date: Feb 2007
Location: New River
Posts: 755
Garage
The top side is done. Fuel lines are built and installed, Vacuum lines are run, and a few other misc tasks and changes have been done. I am waiting on one fitting to connect the incoming fuel line to the hard line.
Two changes I made really make a big visual difference IMHO. Can you spot them?

Now to get to Radiator and hoses, steering and front brakes, fix the fuel leak by the tank, get the rear spoiler from paint and get it installed.
Then there is one more change that will make the whole car POP visually.






__________________
Gone but not forgotten: 1971 914 First Car (SOLD) | 1972 914 rust bucket (SOLD) | 1986 944 Turbo (Murdered by a Chevy Truck on the freeway)
Current lineup: 1990 944 S2 Cabriolet - Long term project | 1971 914 - Long term project #2 | 1971 914 - Driver

Last edited by azbanks; 11-26-2023 at 03:50 AM..
Old 11-26-2023, 03:38 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #77 (permalink)