Quote:
Originally Posted by jyl
The purpose of moving the espresso machine to the main panel is to have all the circuits I want to run through the generator transfer switch together in the main panel, to make the transfer switch wiring tidy. I want the generator to power the heater furnace blower, water heater blower, espresso machine, kitchen lights, kitchen outlets, range (gas range but needs power for convection oven), and maybe one other circuit that my internet and WiFi will be on.
|
I guess I'm not following you here. Wouldn't it make more sense to install a sub panel off the main panel, and put all the circuits you mention above on that panel? Then you'd just start the generator (auto-start?) Disconnect the utility feed, and connect the generator output? (auto transfer switch?)
How big of a generator are you installing? Auto start or manual? Do you plan on switching the load manually or automatically?