View Single Post
Henry Schmidt Henry Schmidt is online now
Try not, Do or Do not
 
Henry Schmidt's Avatar
 
Join Date: Apr 2004
Location: Fallbrook, Ca. 92028
Posts: 14,261
Garage
Quote:
Originally Posted by wilnj View Post
There’s definitely a value to that.

The mistake I made is starting the project when wife was 4 months pregnant with our first and we moved to my mothers during construction. 10 months later, I was almost done but not entirely.

We moved into the house with my 6 month old daughter and everything after that took 10x longer to do because it had to planned around naps, set up and clean up every day, etc.

If you have the time to work through any issues, then it can obviously be done.
The engine shop is a 4 day a week proposition and me don't travel much anymore. God willing, I have time.

I have a 100 year old adobe building that was a house, then converted to office space and after the pandemic, I converted back to residential.
Added an ensuite bath, built a kitchen in an enclosed patio and redid the landscape to be drought resistant (my 106 lb wife and I moved 4 tons of rock and plants to make that happen) . Before we were complete, I friend/contractor was burned out of his place and offered to move in, finish the reno for a reduced rent.
Sometimes the universe offer solutions you never expected.


__________________
Henry Schmidt
SUPERTEC PERFORMANCE
Ph: 760-728-3062
Email: supertec1@earthlink.net
Old 01-05-2024, 11:14 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #20 (permalink)