|
Registered
Join Date: Jan 2002
Location: Nor California & Pac NW
Posts: 24,806
|
Bridges this size are huge projects that take a very long time, but in this case there is great urgency, no seismic issues, and the infrastructure bill passed a couple years ago will provide lots of Federal money. Maybe it can be done in 2-3 years?
It took a decade to replace the Bay Bridge eastern span after the Loma Prieta earthquake, but the initial repair was done in a couple months and the bridge was operable albeit vulnerable, so the urgency wasn’t all there.
__________________
1989 3.2 Carrera coupe; 1988 Westy Vanagon, Zetec; 1986 E28 M30; 1994 W124; 2004 S211
What? Uh . . . “he” and “him”?
|