View Single Post
unclebilly unclebilly is online now
Bland
 
unclebilly's Avatar
 
Join Date: Nov 2003
Location: I'm 'out there...'
Posts: 8,786
Garage
so... nearly a month later.

https://www.cbsnews.com/baltimore/news/salvage-recovery-key-bridge-collapse-baltimore-one-month/

I wonder what design work is underway to replace the bridge and what that timeline could look like. I get that they are still cleaning up but I dont understand why design and procurement couldn't be a parallel path to cleanup (hopefully they are).

There are 3 temporary channels open now and it sounds like the latest one may be able to support some cargo ship traffic. Is this big enough? I have no idea.

The new temporary path, with a controlling depth of 20 feet (6.1 meters), a horizontal clearance of 300 feet (91.4 meters) and a vertical clearance of 135 feet (41.2 meters), allows a greater variety of vessels to access the port while crews work to reopen the main channel, Coast Guard and port Capt. David O’Connell said in a news release.


https://toronto.citynews.ca/2024/04/20/third-temporary-channel-opens-for-vessels-to-baltimore-port-after-bridge-collapse/
__________________
06 Cayenne Turbo S and 11 Cayenne S
77 911S Wide Body GT2 WCMA race car
86 930 Slantnose - featured in Mar-Apr 2016 Classic Porsche
Sold: 76 930, 90 C4 Targa, 87 944, 06 Cayenne Turbo, 73 911 ChumpCar endurance racer - featured in May-June & July-Aug 2016 Classic Porsche
Old 04-24-2024, 02:46 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #220 (permalink)