|
Registered
Join Date: Jun 2000
Location: bottom left corner of the world
Posts: 22,945
|
The last one I did was with oil based poly. The instructions said to wait 24 hours between coats. So I did. The second coat made the first coat curdle, kind of all wrinkled up and turned into a mess. A friend who works for company that is in opposition to Dulux Cabot's said it's a great product but wait four days then deglaze the surface with sandpaper. Then do the next coat. This worked. It was over 100 year old hard wood flooring and still looks beautiful.
I was concerned about small bubbles of air from the roller in the poly, but they disappeared as it cured/dried.
Last edited by Bill Douglas; 06-30-2024 at 06:00 PM..
|