Originally Posted by Wayne 962
Well, I can simply cut the conduit and run the 12V wires without any conduit right to the transformer? Or use some small flexible conduit that can just attach on to where it exits the ground?
-Wayne
|
Without getting a good look at the situation it is tough to advise. The light conduits should be wet below the waterline so normally you would keep them continuous until 18" above grade, otherwise there will be flooding. I would take some pics with measurements and contact Pentair tech support for advice. I am sure they have seen hundreds of these retrofits by now and have a well-established protocol.
What about just separating into two J-boxes. One for low voltage and one for 120VAC so they are completely discrete? It might take an hour to separate them but you will be 100% certain of the result. This should also keep the inspector happy while cutting the conduit may not.
Best wishes!