Quote:
Originally Posted by PeteKz
Add to what porschedude said: Why do you want to change the dizzy? Is there something wrong with the old one? Have you modified the engine?
|
The distributor is need of an overhaul. Its a 6-7 week lead time to have it rebuilt or I can purchase a 123.