Prototypes are currently undergoing durability testing, and although indications are we have a viable product from an engineering viewpoint, there is still much to do.
Next step for us is the pre-production evaluation phase, and concentrating on manufacturing viability. e.g. refining the upper case to eliminate several of the CNC machining steps required for the prototype phase.
The tiny potential market for this and the physical complexity and dimensional tolerances of the module have this silly project jammed well and truly in the "must be near perfect or don't even try" zone.