View Single Post
DavidI DavidI is online now
Registered
 
DavidI's Avatar
 
Join Date: Mar 2002
Location: Southern California
Posts: 2,575
Quote:
Originally Posted by rwest View Post
Nicely done David!

What was your total time from start to finish and how was that Kerdi-board to work with?

I need to do my bathroom soon, but I only have one bathroom in my house, so I need to be ready to go and do it fast. I can pee in a corner of my backyard, but number two might be problematic!
I have some basic skills in construction and did most of the work myself, until I got tired each day. From start to finish, it took approximately calendar 2 months. There were a few periods where my supplies had not arrived or a tile guy was not available. I believe it could be completed within a month knowing what I know now.

Kerdi-board was a little expensive, but the price was worth it. The boards are light foam as opposed to the chalk drywall. It cut very easily with a utility knife and had grid lines to make alignment simple. I was very happy with their products and highly recommend it.
__________________
99 996 C4
11 Panamera 4S
83 SC Targa converted to a 964 cab (sold)
67 912 (sold)
58 Karmann Ghia choptop (traded for the 912)
Old 09-14-2025, 09:21 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #4020 (permalink)