View Single Post
70SATMan 70SATMan is online now
Ayo Irpin, Ukraine!
 
70SATMan's Avatar
 
Join Date: Mar 2004
Location: Santa Cruz, CA
Posts: 12,630
I was looking too. Maybe coming in from the meter service box but, not how I would have done it. We’re now required to have two ground rods per breaker panel with a minimum 6’ rod separation. I added a second rod for our residential panel even though our original service is grandfathered from 1961.
__________________
Harmlessly passing gas in the grassland away;
Only dimly aware of a certain smell in the air
Old 10-23-2025, 05:46 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #28 (permalink)