|
I was looking too. Maybe coming in from the meter service box but, not how I would have done it. We’re now required to have two ground rods per breaker panel with a minimum 6’ rod separation. I added a second rod for our residential panel even though our original service is grandfathered from 1961.
__________________
Harmlessly passing gas in the grassland away;
Only dimly aware of a certain smell in the air
|