Quote:
Originally Posted by rwest
What about three layers of 1/4” marine plywood and stager the joints? Could you at least cover it with roofing paper for some protection before the shingles get put on?
|
I’ve considered this. I’m wondering if taping the edges and covering the joints with ice/snow shield membrane would prevent the edges from swelling.
Probably the best thing would be to install the roof and shingles or whatever all at once. The rest of the structure is pressure-treated so it can sit exposed until I get the roof materials. 1/4” plywood was my first thought.