I installed an exhaust fan and a new pre-hung door. I installed the new Delta shower valves and plumbed it with Pex A. I installed a GFCI protected outlet for my wife's new bidet.
I have minor touch ups to do and paint the ceiling today. I hired tilers to complete the job starting on Monday, December 1st. After they are finished, I'll install the toilet and bidet, finishing shower fixtures, towel rack.
The only thing left to do after that is to hire a company to install dual pass shower doors. Overall the project was a lot of work, but it kept me busy for a month and a half while I am retired.
I know some of you out there have waaaaay more skills than I do at renovations. I did my best and I absolutely know it will work fine.
Rock on, David