The bathroom tile was completed by a friend named Chris and his brother Kenny. They did a great job and are perfectionists.
Almost finished with the bathroom! Dual bypass frameless shower doors will be installed today and all that is left is the seal the grout, install the shower fixtures, install the toilet and bidet, towel bar and give everything a good clean. The wall tile is a textured tile with vertical lines. Almost finished!