View Single Post
Zeke Zeke is online now
Registered
 
Zeke's Avatar
 
Join Date: Jan 2002
Location: Long Beach CA, the sewer by the sea.
Posts: 38,224
They control 2 circuits. One can be changed to a receptacle and the load side will be protected just as it is now.

That has to be a crowded box and by the way the GFCI's sit cockeyed tells me that is the case.
Old Yesterday, 11:54 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #5 (permalink)