Still working on the pool water heater gas line. I need a 12” pipe to replace the two pipe section and the cut off valve, before the flex line.
Also, started the flue pipe. I had (2) 4’ sections and needed (2) 5’ sections. I picked them up on the way home and will finish tomorrow.
Hopefully….