|
Registered
Join Date: Jan 2002
Location: Nor California & Pac NW
Posts: 24,918
|
Yes, occasionally clients will visit. I am leaning toward pulling off the LVP and refinishing. I'm going to ask the previous owner what the condition of the currently covered wood was. The second floor is empty now and will be for some months.
Question: would you have the floor done "last", after everything else is done (electrical, kitchen, bathroom, lighting, wall repair, painting)? I kind of assume that would make sense.
__________________
1989 3.2 Carrera coupe; 1988 Westy Vanagon, Zetec; 1986 E28 M30; 1994 W124; 2004 S211
What? Uh . . . “he” and “him”?
|