|
You guys are turning this into an awfully big project! And if you cut the joists down for drainage you'll be cutting half the joist strength out on the low side of the room. For truly non ponding water, industry standard is a ¼" drop per foot (3" in 12'). And didn't his engineer insist on doubling joists that were already 16" on center in another room?
|