|
Non Compos Mentis
Join Date: May 2001
Location: Off the grid- Almost
Posts: 10,741
|
Moisture test:
Tape a one-foot-square or so piece of plastic visqueen on the floor. Seal all edges tight.
After a day or two, pull up the plastic. If the concrete that was under the plastic is darker than the surrounding area, that's moisture that has been wicking up through the concrete, unable to evaporate.
|