Quote:
Originally posted by k911sc
the problem with that pic is that the builder has started to shingle portions of the roof when other parts have not even been sheeted yet. the roofer is pissed he had to pull off until the lower front gable gets sheeted so he can finish. my guess is the prefabbed trusses were late?
there are also units of floor joist sitting in the road and your house is nearly done. also the tyveck has been completely run and the siding has not even started to be installed. if you have a real windy day its going like a kite off the place.
|
I think that trusses were late, they hadn't done anything for a while and then got rocking with the trusses on Saturday. The joists are for the house next door (to the right).