View Single Post
rjay rjay is offline
Registered
 
rjay's Avatar
 
Join Date: Jan 2003
Posts: 105
The rework should be done in the next day or two. Here are a couple of photos of the interim work. You can see the shock mount taking shape as well as the crossbracing. The first photo shows the boxing for the frame rail connection (all tigged). The second should give you an idea as to how it will all work in the end. the final one is a detail of the tower and how it will connect to the crossbrace. The adjusters will be accessible from the interior through an access panel.




__________________
Tailwagger NER/NCR PCA, SCCA, NASA, COM
2000 996 C2 Aero Brumos 59 Special Ed.
1970 911 3.2L RSR
Old 05-16-2005, 04:14 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #20 (permalink)