View Single Post
stevepaa stevepaa is offline
Registered
 
stevepaa's Avatar
 
Join Date: Dec 2004
Location: san jose
Posts: 4,982
Use schedule 40 PVC for feed water to valves. Does your ground freeze? Usually you bury these lines at least a foot down. If freezing is an issue then you could put a hose bib connection for blowout at the start of the water supply.
__________________
steve
old rocket inguneer
Old 09-27-2005, 09:35 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #2 (permalink)