Quote:
Originally posted by slakjaw
When I built mine, I put Masonite on the top. Then when it gets saturated with oil and stuff you just have to replace the Masonite, not the 2 x 4's under it. It's easier that way.
|
I did the same thing. Just countersink and screw the masonite down to the work bench. I get the masonite that is smooth on both sides so when it gets dirty I can just flip it over.