|
Your mold is about 439 cubic inches. One bag of concrete costs about five bucks at the store and will cover half cubic foot or about 900 cubic inches. That is not including any color additive to make it look like stone plus you have to haul it home and mix it up and pour it into one mold and wait a day to set so two days to make two stones with one bag. You do the math.
__________________
07 997 cab sold
95 993 cab sold
87 911 cab sold
|