|
inside the socket use a plastic bushing and a locknut, pipe to meter socket use a TA (threaded adapter) sched 80 vertically down 24" and use a 90deg sweep at the bottom to cushion the transition. IBEW local 351
__________________
Chris
the more i learn, the less i know
|