View Single Post
trekkor trekkor is offline
JW Apostate
 
trekkor's Avatar
 
Join Date: May 2004
Location: Napa, Ca
Posts: 14,164
Metal lath, ( stucco netting ) in place. Ready for mortar.






I will show all the steps involved in creating a floor to ceiling marble bathroom.

It's going to be 12x12 tumbled marble on the walls and 16x16 tumbled marble on the floor, set diagonally with tile base board.

1/8 inch grout joints.


KT
__________________
'74 914-6 2.6 SS #746
'01 Boxster
Old 04-20-2007, 09:36 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #3 (permalink)