Quote:
Originally posted by carambola
so if we figure this will take two weekends, 1 for demo and footings and 1 for construction, when are we doing this?
permits can be pulled by the homeowner in NJ if this is your primary residence.
|
Sure I can pull the permits but I need a digger , a rigger and a mason, not to mention someone to engineer the job.