Quote:
Originally posted by red-beard
Any more thoughts from the pictures?
|
I would be flipping out by now...
The soft joint between the deck and the flagstone needs to be re-done.
It should be backfilled with sand and then the pourable joint filler applied on top. The material needs to be about 1/2" thick or so.
The saw marks on the edges of the stone make me mad

I'd suggest sanding them with 80 grit first and then using finer grit, maybe 400-600, or until you like the finish.
Use an orbital sander or better yet, a large variable speed disc grinder.
You should not have to see any saw marks...Unacceptable!!
Anywhere the grout is missing or there are holes, these need to removed and redone. Use a dremel with the carbide tile cutting bit.
I see a lot of blue tape
KT