Quote:
Originally Posted by widebody911
Path of least resistance (get it?) is to add a 2nd sub-panel, leaving the existing panel as-is.
|
That's exactly what I was thinking.
I wouldn't have to modify the existing subpanel, and could have a second subpanel dedicated to 220V. The wall that subpanel is mounted on is interior to the garage and hollow--very easy to add a second subpanel on. I want the 220 socket on that wall anyway.
Thank you everyone.