View Single Post
David David is online now
Registered
 
David's Avatar
 
Join Date: Apr 2002
Location: Houston (Clearlake), TX
Posts: 11,362
Garage
Yup... and the company I work for just applied to build two nuclear units.

The biggest problem we face as a power provider with wind, solar, etc. is voltage control. These little wind and solar systems fluctuate too much to maintain system voltage. So a large power plant is forced to adjust its VARs to compensate with no financial compensation. Hopefully the system operators will remedy this, but in the mean time it sucks for us and our share holders.
__________________
2014 Cayman S (track rat w/GT4 suspension)
1979 930 (475 rwhp at 0.95 bar)
Old 12-18-2007, 08:40 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #4 (permalink)