View Single Post
chrisp chrisp is offline
Registered
 
chrisp's Avatar
 
Join Date: Jul 2001
Location: Connecticut
Posts: 1,942
I don't have an exorbitant amount of material. Each piece is 3-4" longer than the finished length of the place it's going. The stripes are pre-cut but are not masked. They'll need to go down individually.

Sounds like I should just lay 'em down wet/straight.
__________________
'83 SC
Old 01-26-2008, 07:33 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #5 (permalink)