Quote:
Originally Posted by notfarnow
Also, how long will it take my wife to spread that out?
|
Your math looks fine...but you
really need to rent a Bobcat loader for that much gravel.
I keep about 3/4 mile of gravel (3/4 quarter inch rock) road in repair on my farm, and move about 12 cubic yard a year keeping the road in shape. Doing it by hand is not an option.
The Bobcat will save you at least a day with that much gravel.
Master the art of smoothing rock with a front end loader in reverse